Advanced Alley Maintenance Program - Phase 1
Title:  

Advanced Alley Maintenance Program - Phase 1

Agency:  

City of Oxnard

State:  

California

NAICS Code:  

237990

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

PW 26-06

Open Date:  

3/5/2026

Close Date:  

3/25/2026

Project Duration:  

100 days

Last Updated:  

3/6/2026

Description:
The City of Oxnard is inviting sealed bids for the Advanced Alley Maintenance Program - Phase 1. The project includes preventative treatments and targeted repairs to preserve alley pavement conditions within various neighborhoods, such as repairing failed asphalt pavement areas, asphalt skin patching, and installing cape seal or slurry to extend pavement life. The successful bidder will be required to furnish performance and payment bonds, and must comply with California State Prevailing Wage requirements. • The project requires a valid California Class-A General Engineering Contractor’s License. • The contractor must perform at least 50% of the total original contract price with its own organization. • The project has a liquidated damages clause, with a $4,200 assessment for each calendar day that work remains incomplete beyond the project completion deadline. • The city reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

grace.hernal@oxnard.org

(805) 385-8280

Budget Estimate (AI):

$750,000 – $1,500,000

The budget for this opportunity can be estimated based on the scope of work, which includes preventative treatments and targeted repairs to preserve alley pavement conditions. The cost of such a project can vary widely depending on the size of the area to be maintained, the type of treatments and repairs required, and the materials and labor needed. However, as a rough estimate, a project of this nature could potentially cost anywhere from $500,000 to $2 million, considering the costs of labor, materials, equipment, and other expenses. The factors that may influence the likely payment range include the complexity of the project, the number of alleys to be maintained, and the condition of the existing pavement. Given these factors, a reasonable estimate for the budget could be between $750,000 and $1.5 million.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.