Stormwater Pump Stations and Control Structures Improvements

This opportunity is closed, click here to see similar open opportunities.

Title:  

Stormwater Pump Stations and Control Structures Improvements

Agency:  

Miami

State:  

Florida

Open Date:  

10/31/2024

Close Date:  

12/4/2024

Last Updated:  

Description:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Scope of Work per Site 1. Arch Creek Phase 1 and 2 Pump Stations: This task includes work on two (2) stormwater pump stations located at NE 18 Ave and NE143 St and NE 14 Ave and NE 144 St. Work includes the installation of three (3) telemetry sensors and integration into the existing SCADA system. 2. Belen Phase 1 and 2 Pump Stations: This task includes work on two (2) stormwater pump stations located at SW 127 Ave and SW 6 St and SW 120 Ave and SW 6 St. Work includes the installation of three (3) telemetry sensors and integration to the existing SCADA system, and installation of new louver windows with extraction capabilities in the pump control room at each pump station. 3. Rucks Park Stormwater Pump Station: This task includes work on one (1) stormwater pump station located at NE 4 Ave and NE 139 St. Work includes the installation of three (3) telemetry sensors and integration to existing SCADA system, installation of a new access door and new louver windows with extraction capabilities for the pump room, installation of a new louver door in the generator room, a new pump control panel, installation of a fixed swingable access door in the wet well trash interceptor, installation and automation of a new 60 inch sluice gate in the wet well with an actuator. 4. Pump Station at SW 87th Avenue and SW 2nd Street: This task includes work on one (1) stormwater pump station located at SW 87 Ave and SW 2 St. Work includes the installation of three (3) telemetry sensors and integration to existing SCADA system, installation, and automation of a new 24-inch sluice gate in the wet well with actuator. 5. Ludlam Glades Water Control Structure: This task includes work on the Ludlam Glades Water Control Canal Structure located at 6398 SW 80 Street. Work includes the replacement of one (1) actuator and converting the existing electric power source from 120V single phase to 240V three phase, coordination with FPL is required for all electric power connection. In addition, installation of three (3) telemetry sensors and integration to the existing SCADA system. 6. Sunswept Isles Water Control Structure: This task includes work on the Sunswept Isles Water Control Canal Structure located at 2445 NE 207 Street. Work includes converting the existing electric power source from 120V single phase to 240V three phase, which includes the installation of underground electric power cables from the primary lines at approximately 900 Feet to the East along NW 207 St. In addition, the installation of three (3) telemetry sensors and integration into the existing SCADA system.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

There is no contact information available at this time.

Budget Estimate:

There is no budget estimate available at this time.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.