Proj No.: 95170, Construct a 10MW Generation Plant, with Microgrid Controls

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Proj No.: 95170, Construct a 10MW Generation Plant, with Microgrid Controls

Agency:  

U.S. Department Of Defense

State:  

Georgia

NAICS Code:  

237130

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

W912HN25B3000

Open Date:  

2/27/2025

Close Date:  

3/20/2025

Project Duration:  

1080 Calendar Days

Last Updated:  

3/13/2025

Description:
The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) for the construction of a 10MW Generation Plant, with Microgrid Controls at Fort Stewart, Georgia. The project includes the installation of an underground natural gas line, unit step up transformers, paralleling switchgear, and protective relaying. The microgrid control system will be installed to match mission critical facility loads with available supply. The project also includes the connection of an existing solar photovoltaic (PV) array to the microgrid. The estimated magnitude of construction is between $25,000,000 and $100,000,000. • The project requires the construction of a 10MW natural gas generation plant connected to Fort Stewart Substation. • The installation of an underground natural gas line to service the generation plant. • The provision of each generator with a unit step up transformer to match the distribution voltage. • The installation of a microgrid control system to match mission critical facility loads with available supply. • The connection of an existing solar photovoltaic (PV) array to the microgrid.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Gerard Leo(Contract Specialist)

gerard.f.leo@usace.army.mil

(912) 652-5001

Budget Estimate (AI):

$25,000,000 – $100,000,000

Based on the estimated magnitude of construction, which is between $25,000,000 and $100,000,000, the budget for this project is likely to be within this range. The actual budget will depend on the bid price and the terms of the contract. The complexity of the project, including the construction of a generation plant and microgrid controls, also supports a higher budget.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.