Liquid Nitrogen Air Separation Unit (LNASU) for John C. Stennis Space Center

This opportunity is closed, click here to see similar open opportunities.

Title:  

Liquid Nitrogen Air Separation Unit (LNASU) for John C. Stennis Space Center

Agency:  

National Aeronautics And Space Administration

State:  

Mississippi

NAICS Code:  

325120

Industry:  

Aerospace and Defense

Solicitation Type:  

Sole Source

Solicitation ID:  

80SSC026R0003

Open Date:  

11/17/2025

Close Date:  

12/3/2025

Project Duration:  

18 months

Last Updated:  

Description:
The NASA/NASA Shared Services Center (NSSC)/John C. Stennis Space Center (SSC) is seeking to acquire a Pine 8 liquid nitrogen air separation unit (LNASU) to meet specific requirements. The system should include all necessary components for operation, as well as selected optional equipment and services to ensure full integration, operability, and maintainability. The scope of supply includes a base equipment package, services, and optional equipment. The technical requirements include performance, utilities, and environmental conditions. The project duration is estimated to be 18 months. Key aspects of the project include: • Acquisition of a Pine 8 LNASU • Integration and installation of the system • Commissioning and testing services • Operator training • Warranty and maintenance requirements • Compliance with various standards and regulations
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Melissa Wagner

melissa.r.wagner@nasa.gov

(228) 688-1065

Budget Estimate (AI):

$1,500,000 – $7,000,000

The budget for this project can be estimated based on the scope of work and the type of equipment being acquired. The Pine 8 liquid nitrogen air separation unit is a specialized piece of equipment, and its cost can range from $1 million to $5 million, depending on the specific requirements and configuration. Additionally, the cost of installation, commissioning, and maintenance should be considered, which can add another $500,000 to $2 million to the total cost. Therefore, the estimated budget for this project could be between $1.5 million and $7 million. Factors that may influence the likely payment range include the complexity of the system, the requirements for installation and commissioning, and the cost of maintenance and upkeep.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.