PMAA, HPBL, Barr Lake SP - Archery Shade Shelter, C25R02
Agency:Colorado Division of Parks and Wildlife
State:Colorado
NAICS Code:237990
Industry:Construction
Solicitation Type:Invitation for Bid
Solicitation ID:DQ1-PMAA-2026000143-1
10/10/2025
Pre-Bid Meeting Date:10/27/2025
Questions Due Date:10/30/2025
Close Date:11/5/2025
Projected Award Date:11/10/2025
Project Duration:60 days
Last Updated:10/21/2025
Please visit the bid source via the “Link to Bid Source” button below for documentation.
Jordan Hasz(Project Manager)
jordan.hasz@state.co.us
(303) 291-7393
$200,000 – $500,000
Given the details of the project, including the construction of a 2,176 square foot concrete pad and a 1,771 square foot shade shelter, along with a channel drain system, and considering the 60-day project duration, the budget could range widely depending on labor, materials, and equipment costs. However, as a rough estimate, a project of this scope could potentially cost between $200,000 to $500,000, considering average costs for similar construction projects. This estimate takes into account the need for specialized labor, materials such as concrete, steel for the structure, and drainage system components, as well as equipment rental and operational costs.
The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.
Success stories in virtually every industry you can check out by clicking here.