Concrete Removal and Installation at Various City of Miami Parks

This opportunity is closed, click here to see similar open opportunities.

Title:  

Concrete Removal and Installation at Various City of Miami Parks

Agency:  

Florida City of Miami

State:  

Florida

NAICS Code:  

238110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

2010386

Open Date:  

4/23/2025

Pre-Bid Meeting Date:  

4/29/2025

Questions Due Date:  

5/7/2025

Close Date:  

5/21/2025

Project Duration:  

6 years

Last Updated:  

Description:
The City of Miami is seeking bids for the removal and installation of concrete, pavers, and walkways at various city parks. The contractor will be responsible for conducting site visits, mobilizing personnel and equipment, obtaining necessary permits, and performing environmental testing. The contractor must also provide a one-year warranty for workmanship and materials, and ensure that all debris is removed and disposed of off-site. The project duration is expected to be six years, and the contractor must comply with all applicable laws, codes, and regulations, including those related to public records, sunshine, conflict of interest, and ethics. • The contractor must have a general contractor's license and at least three years of experience in stucco and concrete repair services. • The contractor must provide a reference sheet and an anti-human trafficking affidavit with their bid. • The contractor must ensure that all work is done in compliance with local regulations and that all necessary permits are secured. • The contractor must provide a detailed schedule indicating project duration and adhere closely to the agreed schedule. • The contractor must conduct a thorough inspection of the stucco and concrete surfaces, identify areas requiring repair, and prepare the surfaces for repair.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Teresa Soto(Contracting Officer)

tsoto@miamigov.com

(305) 416-1919

Budget Estimate (AI):

$5,000,000 – $20,000,000

The budget for this contract is expected to be substantial, given the project duration of six years and the scope of work involved. The City of Miami has not provided a specific estimate, but based on industry standards, a rough estimate for a project of this nature could be in the range of $5 million to $20 million. This estimate takes into account the costs of labor, materials, equipment, and other expenses associated with the removal and installation of concrete, pavers, and walkways at various city parks.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.