Proj No.: 95170, Construct a 10MW Generation Plant, with Microgrid Controls
Title:  

Proj No.: 95170, Construct a 10MW Generation Plant, with Microgrid Controls

Agency:  

U.S. Department Of Defense

State:  

Georgia

NAICS Code:  

237130

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

W912HN25BA006

Open Date:  

3/20/2025

Close Date:  

7/16/2025

Project Duration:  

1080 days

Last Updated:  

6/11/2025

Description:
The U.S. Army Corps of Engineers (USACE) Savannah District is seeking bids for the construction of a 10MW generation plant with microgrid controls at Fort Stewart, Georgia. The project includes the installation of an underground natural gas line, unit step-up transformers, a paralleling switchgear, and protective relaying. The microgrid control system will be installed to match mission-critical facility loads with available supply. The project also includes the integration of an existing solar photovoltaic (PV) array with the microgrid. The period of performance is 1,080 calendar days after the issuance of the notice to proceed. Key features of the project include: • Installation of a 10MW natural gas generation plant • Installation of an underground natural gas line • Installation of unit step-up transformers and a paralleling switchgear • Installation of protective relaying and microgrid control systems • Integration of an existing solar photovoltaic (PV) array with the microgrid • Modification of the substation to upgrade relaying on circuit breakers • Upgrade of feeder breakers to provide operational compatibility with new switchgear and the main service
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Gerard Leo(Contract Specialist)

gerard.f.leo@usace.army.mil

(912) 652-5001

Budget Estimate (AI):

$25,000,000 – $100,000,000

The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000. Based on this information, the budget for this project is likely to be in the tens of millions of dollars. The actual budget will depend on the bid submitted by the contractor and the final contract award. Factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the contractor, and the availability of materials and labor.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.