ITB: Horizontal Directional Drilling St. James Bridge
Title:  

ITB: Horizontal Directional Drilling St. James Bridge

Agency:  

North Carolina Brunswick County

State:  

North Carolina

NAICS Code:  

237110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

299-299-297-13

Open Date:  

6/24/2025

Questions Due Date:  

7/21/2025

Close Date:  

8/4/2025

Project Duration:  

60 days

Last Updated:  

6/29/2025

Description:
The project involves the installation of two horizontal directional drills at 2785 Pinecrest Drive, Southport, NC 28461. The work includes installing a 6” water line approximately 250 feet in length and a 4” sewer force main approximately 500 feet in length, as well as abandoning an existing 4” force main approximately 150 feet in length. The contractor shall pressure test, flush, chlorinate, perform a bacteriological test, and connect the new lines to existing infrastructure. The existing sewer line shall remain in operation during the installation of the directional drill and will only be shut down for the final connections. Key aspects of the project include: • Installing HDPE high-density polyethylene, extra high molecular-weight, PE3408 pressure rated 200PSI, minimum DR-9, as manufactured by Plexco or equal using horizontal directional drilling methods • Reconnecting using open-cut methods at each end of the directional drill, incorporating all necessary fittings and bends to ensure a complete and secure tie-in to the existing water or sewer line • Pressure testing, chlorinating, and performing BAC-T tests on the water line • Abandoning the existing section of sewer force main pipe by filling it completely with flowable fill • Establishing traffic control during the performance of the work, ensuring measures are in place for safety and all compliance requirements • Seeding and mulching the site to BCPU standard specifications and establishing sufficient vegetation to stabilize the disturbed areas
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Mario Barron(Procurement Contact)

Mario.barron@brunswickcountync.gov

(910) 253-2627

Budget Estimate (AI):

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of water and sewer lines, as well as the abandonment of an existing force main. The cost of materials, labor, and equipment will contribute to the overall budget. Considering the project's requirements, a rough estimate for the budget could be between $200,000 and $500,000. This range is based on industry standards for similar construction projects and takes into account the need for specialized equipment and labor for horizontal directional drilling.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.