Whispering Oaks Subdivision Phase II Construction

This opportunity is closed, click here to see similar open opportunities.

Title:  

Whispering Oaks Subdivision Phase II Construction

Agency:  

Mississippi City of Pass Christian

State:  

Mississippi

NAICS Code:  

237310

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

208-20260108152728

Open Date:  

1/9/2026

Close Date:  

2/17/2026

Last Updated:  

Description:
The City of Pass Christian, Mississippi, is seeking bids for the construction of the Whispering Oaks Subdivision Phase II. The project includes the installation of new water mains, fire hydrant assemblies, gravity sewer mains, storm drain system, roads, and other infrastructure improvements. The contractor will be required to consult with a licensed arborist to protect the roots and ensure the long-term health of protected Live Oak Trees. The bid documents are available online, and a certified check or bank draft payable to the order of City of Pass Christian, Mississippi, is required with each bid. • The project includes infrastructure improvements such as new water mains, fire hydrant assemblies, and gravity sewer mains. • The contractor must consult with a licensed arborist to protect the roots and ensure the long-term health of protected Live Oak Trees. • The bid documents are available online, and a certified check or bank draft is required with each bid. • The City of Pass Christian reserves the right to consider factors such as the bidder's skill, experience, and previous conduct in determining the lowest and best bid. • The City also reserves the right to reject any or all bids or to waive any informalities in the bidding.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Bob Escher

bob.escher@ccellc.us

Budget Estimate (AI):

$1,000,000 – $5,000,000

The budget for this project is likely to be in the range of $1 million to $5 million, based on the scope of work, which includes infrastructure improvements such as new water mains, fire hydrant assemblies, gravity sewer mains, storm drain system, roads, and other infrastructure improvements. The cost of materials, labor, and equipment will contribute to the overall budget. Additionally, the requirement for a certified check or bank draft payable to the order of City of Pass Christian, Mississippi, with each bid, which is equal to 5% of the total bid, suggests that the project value is substantial.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.