Lounge Walk-in Cooler Project
Title:  

Lounge Walk-in Cooler Project

Agency:  

Barefoot Bay Recreation District

State:  

Florida

NAICS Code:  

238220

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

RFP-2025-01-0-2025/lak

Open Date:  

5/28/2025

Pre-Bid Meeting Date:  

6/6/2025(Mandatory)

Close Date:  

6/27/2025

Last Updated:  

6/16/2025

Description:
The Barefoot Bay Recreation District is seeking a proposal for the replacement of an existing exterior walk-in cooler at The Lounge, located at 625 Barefoot Blvd. The project includes the design, engineering, and permitting of a new walk-in cooler, as well as the demolition and removal of the existing cooler and associated equipment. The new cooler will have specific dimensions and features, including a freezer and beer cooler. The project also includes the installation of structural safety barricades and the removal of existing fence and re-installation of new fence. The successful proposer will be responsible for obtaining all required permits and ensuring compliance with relevant regulations. Key features of the project include: • Demolition and removal of existing walk-in cooler • Installation of new exterior walk-in cooler with specific dimensions and features • Design, engineering, and permitting for the project • Installation of structural safety barricades • Removal and re-installation of existing fence • Compliance with relevant regulations and permitting requirements
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Leslie Kadlec(Pools Supervisor)

lesliekadlec@bbrd.org

Budget Estimate (AI):

$200,000 – $500,000

The estimated budget for this project can be estimated based on the scope of work, which includes the design, engineering, and installation of a new walk-in cooler, as well as the demolition and removal of existing equipment. The cost of materials, labor, and permitting will influence the final budget. A rough estimate for a project of this nature could be in the range of $200,000 to $500,000, considering the specific requirements and equipment listed. Factors that may influence the budget include the complexity of the design, the cost of materials and labor, and the requirements for permitting and compliance.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.