FLAMINGO WASH, CIMARRON BRANCH FROM RUSSELL ROAD TO PATRICK LANE AND PATRICK LANE - DURANGO DRIVE TO RAINBOW BOULEVARD

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

FLAMINGO WASH, CIMARRON BRANCH FROM RUSSELL ROAD TO PATRICK LANE AND PATRICK LANE - DURANGO DRIVE TO RAINBOW BOULEVARD

Agency:  

Nevada Government

State:  

Nevada

NAICS Code:  

237990

Industry:  

Civil Engineering

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

607624-25 Addendum 3

Open Date:  

7/10/2025

Pre-Bid Meeting Date:  

7/17/2025

Questions Due Date:  

8/12/2025

Close Date:  

8/20/2025

Last Updated:  

8/18/2025

Description:
The Clark County Regional Flood Control District is inviting bids for the construction of the Flamingo Wash, Cimarron Branch flood control facility. The project includes the construction of a 12'x6' pre-cast RCB storm drain, a 12' wide by 5' high rectangular concrete channel, and a maintenance access ramp. The project also includes the construction of a full-width roadway on Patrick Lane and Oquendo Road, as well as utility modifications and relocations. The successful bidder will be responsible for completing the work according to the plans and specifications provided. Key aspects of the project include: • Construction of a 12'x6' pre-cast RCB storm drain across Patrick Lane • Construction of a 12' wide by 5' high rectangular concrete channel • Construction of a full-width roadway on Patrick Lane and Oquendo Road • Utility modifications and relocations • Installation of traffic signage and appurtenances • Construction of a maintenance access ramp The project requires the contractor to have experience with flood control facility construction, storm drain installation, and roadway construction.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Scott Basquiat-Jones(Bid Contact)

[email protected]

(702) 455-4441

Budget Estimate (AI):

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work and the complexity of the project. Considering the construction of a flood control facility, storm drains, and roadways, the budget could range from $5 million to $15 million. This estimate takes into account the cost of materials, labor, and equipment required for the project. However, the actual budget may vary depending on the bidder's experience, the complexity of the project, and the availability of resources.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.