Installation of Intake Screens, Floating Docks and Piping Modifications
Agency:Connecticut City of Groton
State:Connecticut
NAICS Code:237110
Industry:Construction
Solicitation Type:Invitation for Bid
Solicitation ID:GU-26-1
1/14/2026
Close Date:2/4/2026
Last Updated:Please visit the bid source via the “Link to Bid Source” button below for documentation.
Derick Hopkins(Project Engineer)
Derick.hopkins@wright-pierce.com
$500,000 – $2,000,000
The budget for this project can be estimated based on the scope of work, which includes the installation of intake screens, floating docks, and piping modifications. The cost of such a project can vary widely depending on the specific requirements and materials needed. However, based on industry standards, a rough estimate for a project of this nature could be in the range of $500,000 to $2 million. This estimate takes into account the cost of materials, labor, and equipment needed for the installation of the intake screens, floating docks, and piping modifications.
The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.
Success stories in virtually every industry you can check out by clicking here.