FY26 Corpus Christi Ship Channel Placement Area (PA) 6 Improvements
Title:  

FY26 Corpus Christi Ship Channel Placement Area (PA) 6 Improvements

Agency:  

U.S. Department Of Defense

State:  

Texas

NAICS Code:  

237990

Industry:  

Construction

Solicitation Type:  

Request for Information

Solicitation ID:  

W912HY-26-X-1BG9

Open Date:  

3/25/2026

Close Date:  

4/8/2026

Projected Award Date:  

9/1/2026

Project Duration:  

365 days

Last Updated:  

Description:
The U.S. Army Corps of Engineers, Galveston District is seeking information from industry for the FY26 Corpus Christi Ship Channel Placement Area (PA) 6 Improvements project. The project involves construction within a shallow channel, including shoreline repair of an existing breakwater structure and extension of the existing breakwater. The period of performance is 365 calendar days after the date the contractor receives the Notice to Proceed. The estimated construction price range for this project is between $15,000,000 and $20,000,000. Some key points to consider: • The project requires construction experience as a prime contractor working on Dredged Material Placement Areas. • The contractor should demonstrate experience with equipment with low ground pressure due to the soft/wet material in which the equipment will be operating. • Performance and Payment Bonds are required within 5 calendar days after award. • The contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed. • Liquidated damages of $4,471 per calendar day of delay will be applied if the contractor fails to complete the work within the specified time.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Wesley Baskovic

wesley.n.baskovic@usace.army.mil

Budget Estimate (AI):

$15,000,000 – $20,000,000

Based on the estimated construction price range provided in the document, the budget for this project is likely to be between $15,000,000 and $20,000,000. The actual budget may vary depending on the complexity of the project, the experience and qualifications of the contractor, and other factors. The estimated construction price range is likely based on the scope of work, which includes shoreline repair and extension of the existing breakwater, and the period of performance of 365 calendar days.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.