Bid Banana
Search
Favorites
NEW!
Company Profile
Flex Services
Blog
Search
Favorites
Flex Services
FAQ
Privacy Policy
Terms of Use

This website and its content is copyright of The Bid Lab © 2026.
The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

banana leaves
25/26-010 Exterior Painting at Upland Elementary and Upland Jr. High School- RFP
banana leaves
Back
Title:  

25/26-010 Exterior Painting at Upland Elementary and Upland Jr. High School- RFP

Agency:  

Upland Unified School District

State:  

California

NAICS Code:  

238320

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

Bid No. 25/26‑010

Open Date:  

4/9/2026

Pre-Bid Meeting Date:  

4/16/2026(Mandatory)

Site Visit Date:  

4/16/2026(Mandatory)

Questions Due Date:  

4/16/2026

Close Date:  

4/16/2026

Projected Award Date:  

2/18/2026

Project Duration:  

44 days

Last Updated:  

Description:
Upland Unified School District is seeking a qualified painting contractor to completely repaint the exterior of Upland Elementary School and Upland Junior High School. The contractor must handle all aspects of surface preparation, priming, and top‑coat application across a variety of building materials while meeting strict VOC, lead‑safe, and weather‑restriction standards. The work must start by early June, finish by mid‑July, and comply with California prevailing‑wage and labor‑compliance requirements. • Repaint all exterior walls, trims, railings, metal doors, windows, vents, roof flashings, concrete/brick surfaces, and portable classroom units. • Provide all labor, tools, equipment, paint, primers, and protective measures; submit draw‑down samples and single‑batch color runs. • Follow detailed preparation procedures (water‑blasting, mildew removal, crack repair, priming) and obtain district inspection approval before each coat. • Must attend the mandatory job‑walk on April 8 2026; all RFI’s due by April 23 2026; bid submission deadline April 30 2026; contract start June 5 2026, substantial completion July 19 2026.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Robyn Wilson(Director – Maintenance, Operations, Transportation & Construction)

robyn_wilson@upland.k12.ca.us

(909) 949-7823

Budget Estimate (AI):

$600,000 – $1,200,000

The district is repainting two sizable school campuses. Assuming each school has roughly 150,000 sq ft of exterior surface, and using typical California exterior‑paint costs of $1.50–$2.50 per sq ft (including labor, prep, and materials), the base paint cost ranges from $450,000 to $750,000. Adding project‑management, bonding, insurance, and contingency (≈30 %), the total contract value likely falls between $600,000 and $1,200,000. This estimate reflects the extensive surface preparation required, VOC‑compliant paint specifications, and the short 44‑day execution window.

Similar Opportunities powered by Bid Banana AI™

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.

The Bid Lab Group