Little Patuxent Water Reclamation Plant (LPWRP) Flow Equalization Improvements - Engineering Design Services

This opportunity is closed, click here to see similar open opportunities.

Title:  

Little Patuxent Water Reclamation Plant (LPWRP) Flow Equalization Improvements - Engineering Design Services

Agency:  

Howard County, Office of Procurement

State:  

Maryland

NAICS Code:  

541620

Industry:  

Civil Engineering

Solicitation Type:  

Request for Expression of Interest

Solicitation ID:  

EOI-06-2025

Open Date:  

2/26/2025

Pre-Bid Meeting Date:  

3/10/2025

Close Date:  

4/30/2025

Project Duration:  

36 months

Last Updated:  

Description:
The County of Howard, Maryland, is seeking a qualified engineering consulting firm to provide comprehensive engineering services for the design, bidding, and construction phases of the Little Patuxent Water Reclamation Plant (LPWRP) Flow Equalization Improvements Project. The project involves replacing three existing flow equalization basins with new basins, providing a total storage capacity of 8 million gallons. The scope of work includes full design development, project permitting, engineering assistance during the bidding process, and construction phase support. The selected consultant will deliver a solution that meets current and anticipated operational demands while ensuring compliance with applicable codes and regulatory requirements. Key aspects of the project include: * Design and construction of four new rectangular cast-in-place concrete basins, each with a capacity of 2 MG * Installation of yard piping for flow equalization influent, effluent, and overflow connections * Equipping each basin with a 60 HP jet mix pump, a 40 HP blower, and a 195-ft jet mix fiberglass-reinforced plastic (FRP) header * Incorporating flushing gates and water cannons for cleaning and maintenance * Providing electrically actuated 24” plug valves for flow equalization influent and effluent flow control * Ensuring proper integration with the plant's Supervisory Control and Data Acquisition (SCADA) system
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Karen Aghdassi(Buyer)

kaghdassi@howardcountymd.gov

(410) 313-6377

Budget Estimate (AI):

$1,000,000 – $5,000,000

The budget for this project can be estimated based on the scope of work and the typical costs associated with engineering design services for a water reclamation plant. Considering the project's complexity and the need for specialized engineering services, a rough estimate for the budget could be between $1 million and $5 million. This estimate takes into account the costs of design development, project permitting, engineering assistance during the bidding process, and construction phase support. Factors that may influence the likely payment range include the consultant's level of expertise, the complexity of the design, and the need for additional services or support during the project.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.