CU Boulder-UCB000817-SITE-Potable Water Line Replacement
Agency:University of Colorado Design and Construction
State:Colorado
NAICS Code:237110
Industry:Civil Engineering
Solicitation Type:Invitation for Bid
Solicitation ID:Notice NO. 25-36
4/2/2025
Pre-Bid Meeting Date:4/9/2025(Mandatory)
Questions Due Date:4/11/2025
Close Date:4/17/2025
Last Updated:4/17/2025
Please visit the bid source via the “Link to Bid Source” button below for documentation.
Nicole Arena
nicole.arena@colorado.edu
(303) 265-1271
$200,000 – $500,000
The budget for this project can be estimated based on the scope of work, which involves replacing 450 linear feet of 8-inch diameter waterline. The cost of materials, labor, and equipment will be significant factors in determining the budget. Assuming an average cost of $100 per linear foot for waterline replacement, the total cost would be around $45,000. However, this is a rough estimate and the actual budget may be higher or lower, depending on the complexity of the project, the number of bidders, and other factors. A more realistic estimate would be between $200,000 and $500,000, considering the costs of excavation, piping, connections, and restoration of the roadway.
The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.
Success stories in virtually every industry you can check out by clicking here.