Delta College: Gilford Transmitter Building Cooling System Replacement
Title:  

Delta College: Gilford Transmitter Building Cooling System Replacement

Agency:  

Michigan Delta College

State:  

Michigan

NAICS Code:  

238220

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

2024045

Open Date:  

7/23/2025

Pre-Bid Meeting Date:  

7/29/2025

Site Visit Date:  

7/29/2025

Questions Due Date:  

8/8/2025

Close Date:  

8/13/2025

Last Updated:  

8/9/2025

Description:
The Delta College is seeking a contractor to replace the cooling system at the Gilford Transmitter Building. The project involves the removal of existing air conditioning units, condensing units, ductwork, refrigerant piping, and electrical connections. The contractor will need to install new air conditioning units, condensing units, ductwork, refrigerant piping, and electrical connections. The project requires the contractor to follow specific sequencing notes to ensure that the radio transmission system continues to operate without interruption. The contractor will also need to provide a new thermostat/controller with a display screen, connect the new duct smoke detectors to the existing fire alarm panel, and revise the panel DP-3 circuit breakers and wiring. Key aspects of the project include: • Removal of existing cooling system components • Installation of new cooling system components • Sequencing of work to ensure continuous operation of the radio transmission system • Connection of new duct smoke detectors to the existing fire alarm panel • Revision of panel DP-3 circuit breakers and wiring
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Anthony Khalil

anthonykhalil@delta.edu

(989) 686-9407

Budget Estimate (AI):

$200,000 – $500,000

Based on the scope of work, the budget for this project could range from $200,000 to $500,000. This estimate takes into account the cost of materials, labor, and equipment required for the removal and installation of the cooling system components. The actual budget may vary depending on the contractor's bid and the college's budget. Factors that may influence the budget include the complexity of the project, the need for additional work or repairs, and the availability of materials and labor.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.