2026-IFB-309-Bear Creek Water Treatment Plant High Service Pump Addition

This opportunity is closed, click here to see similar open opportunities.

Title:  

2026-IFB-309-Bear Creek Water Treatment Plant High Service Pump Addition

Agency:  

Georgia Douglasville-Douglas County Water and Sewer Authority

State:  

Georgia

NAICS Code:  

237110

Industry:  

Utilities and Waste Management

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

IFB #309

Open Date:  

1/28/2026

Pre-Bid Meeting Date:  

2/11/2026

Close Date:  

2/25/2026

Last Updated:  

Description:
The Douglasville-Douglas County Water and Sewer Authority is seeking bids for the Bear Creek Water Treatment Plant High Service Pump Addition project. The project involves installing an additional 2500 hp High Service Pump in the existing High Service Pump Station Building and a High Service Pump Variable Speed Drive and Control Panel in the existing Electrical Building. The contractor will also be responsible for installing new pump discharge piping and valves, wiring, and conduit for providing power and instrumentation SCADA controls. The authority has purchased the 2500 hp High Service Vertical Turine Pump and Variable Speed Control Panel, as well as the 24" diameter GA Industries Flange Pump Check Ball Valve and Control Panel. • The project requires a Utility Contractors License. • The contractor must meet the contractor's qualifications and sub-contractor's qualifications listed in the contract specification documents. • The contractor must be on, or promptly qualify for inclusion on, the Douglasville-Douglas County Water and Sewer Authority's Pre-Approved Contractors List. • All work will be performed on authority property, and all anticipated property and easements required for the project have been acquired by the authority. • All anticipated federal, state, and local permits required for the project have been obtained.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Joseph Morency(Buyer Contact)

jmorency@ddcwsa.com

(770) 920-3864

Budget Estimate (AI):

$750,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a 2500 hp high service pump, variable speed drive, and control panel, as well as new pump discharge piping and valves. The cost of such a project can range from $500,000 to $2 million, depending on the complexity of the installation, the cost of materials, and the labor required. The authority has already purchased the 2500 hp High Service Vertical Turine Pump and Variable Speed Control Panel, as well as the 24" diameter GA Industries Flange Pump Check Ball Valve and Control Panel, which may reduce the overall cost of the project. However, the bid package must be obtained for a deposit of $600.00 per printed set or $25.00 per electronic set, and all bids must be accompanied by adequate bid security (certified check, bid bond, or irrevocable letter of credit) drawn in favor of the authority and in the amount of five percent (5%) of the total bid price. Considering these factors, the estimated budget range for this project is between $750,000 and $1.5 million.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.