Wastewater Treatment Plant Headworks Bar Screen Replacement Request for Bid Re-Bid
Agency:City of Georgetown
State:South Carolina
NAICS Code:237110
Industry:Civil Engineering
Solicitation Type:Invitation for Bid
Solicitation ID:3408
3/3/2025
Close Date:4/2/2025
Last Updated:Please visit the bid source via the “Link to Bid Source” button below for documentation.
Nereo Parreno
purchasing@georgetownsc.gov
(843) 545-4046
$200,000 – $500,000
The budget for this project can be estimated based on the type of work involved. Replacing a bar screen system at a wastewater treatment plant can be a significant project, and the cost can vary depending on the size of the plant, the type of system being replaced, and the materials used. However, based on industry standards, a rough estimate for this type of project could be between $200,000 and $500,000. This estimate is based on the assumption that the project will require specialized labor, equipment, and materials, and that the contractor will need to ensure that the new system meets the City's requirements and is installed correctly.
The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.
Success stories in virtually every industry you can check out by clicking here.