SBA- Market Survey Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 6b Pilot Project
Title:  

SBA- Market Survey Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 6b Pilot Project

Agency:  

U.S. Department Of Defense

State:  

New York

NAICS Code:  

236118

Industry:  

Construction

Solicitation Type:  

Request for Information

Solicitation ID:  

W912DS25S0053

Open Date:  

6/23/2025

Close Date:  

7/3/2025

Last Updated:  

6/29/2025

Description:
The U.S. Army Corps of Engineers is conducting a market survey to gain knowledge of potential construction contractors for a design-build contract for nonstructural home elevation of up to 73 homes in Suffolk County, NY. The project involves elevating homes to their respective Design Flood Elevation, which includes disconnecting utilities, excavating around building footprints, jacking up structures, installing new foundation elements, and reconnecting utilities. The project also includes floodproofing actions such as filling basements and protecting utilities. The construction cost is estimated to be between $50,000,000 and $100,000,000. • The project is a design-build contract that includes both design and construction. • The scope of work includes elevating homes to their respective Design Flood Elevation. • The project involves floodproofing actions such as filling basements and protecting utilities. • The construction cost is estimated to be between $50,000,000 and $100,000,000. • The project is expected to reduce the frequency of flooding for the elevated structures.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Michael McCue

michael.l.mccue@usace.army.mil

Budget Estimate (AI):

$50,000,000 – $100,000,000

The construction cost for this project is estimated to be between $50,000,000 and $100,000,000. This range suggests that the budget for the contractor will be significant, likely in the tens of millions of dollars. The actual budget will depend on the final construction cost, which may be influenced by factors such as labor costs, materials, and equipment. The budget estimation is based on the construction cost range provided in the document. The lower end of the estimate ($50,000,000) may be more likely if the project encounters fewer complexities and challenges, while the higher end of the estimate ($100,000,000) may be more likely if the project requires more extensive work or encounters unexpected issues.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.