East Bay Stormwater Improvement Project

This opportunity is closed, click here to see similar open opportunities.

Title:  

East Bay Stormwater Improvement Project

Agency:  

City of Lakeland

State:  

Florida

NAICS Code:  

236220

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

2026-ITB-015

Open Date:  

2/27/2026

Pre-Bid Meeting Date:  

3/11/2026(Mandatory)

Questions Due Date:  

3/19/2026

Close Date:  

3/30/2026

Last Updated:  

Description:
The City of Lakeland is seeking a qualified contractor to retrofit an existing dry retention pond with an underdrain system. The project involves removing the underdrains and installing a biosorption-activated media (BAM) system under the pond bottom. The BAM system will reduce nutrient concentrations in stormwater flows by 45%. The contractor will be responsible for furnishing all necessary labor, equipment, and materials for the project. The project includes drainage structure modifications, removal of concrete ditch pavement, sodding, underdrain and impermeable liner installation, specialty valve installation, and associated ancillary activities. • The contractor must provide a qualified field representative to be on site during delivery, stockpiling, installation, and maintenance of the BAM media. • The contractor must submit engineered soil media specification sheets, including shipping, handling, storage, installation, and maintenance recommendations. • The contractor must provide a certificate of authenticity for the BAM media delivered to the project site. • The contractor must comply with all applicable laws, rules, regulations, and ordinances related to safety and health. • The contractor must provide insurance coverage, including workers' compensation, liability, and property damage insurance.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Jessica Schilling(Senior Buyer)

jessica.schilling@lakelandgov.net

(863) 834-8439

Budget Estimate (AI):

$1,000,000 – $5,000,000

Based on the scope of work, the budget for this project could be in the range of $1 million to $5 million. The project involves significant construction activities, including drainage structure modifications, removal of concrete ditch pavement, and underdrain and impermeable liner installation. The cost of materials, labor, and equipment will contribute to the overall budget. Additionally, the contractor will need to provide insurance coverage, which will also impact the budget.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.