Description:
The City of Rocklin is seeking bids for the Park Drive Dig Outs project, which consists of removing existing asphalt concrete surfacing and underlying base material and replacing the removed surfacing and base material with new asphalt concrete. The project requires a mandatory pre-bid conference attendance and has an estimated construction cost of $348,587.36. The project duration is thirty working days, and the contractor must have a Class A or Class B license with a C-12 classification. The bid includes various items such as excavate/replace asphalt concrete, striping, and identifying, protecting, adjusting, and/or restoring existing manholes, utility boxes, and monuments to grade. • The project involves removing and replacing asphalt concrete surfacing and base material. • The contractor must attend a mandatory pre-bid conference. • The project has an estimated construction cost of $348,587.36. • The project duration is thirty working days. • The contractor must have a Class A or Class B license with a C-12 classification. • The bid includes various items such as excavate/replace asphalt concrete, striping, and identifying, protecting, adjusting, and/or restoring existing manholes, utility boxes, and monuments to grade.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Kristie Martin(Bid Contact)

Kristie.Martin@rocklin.ca.us

(916) 625-5013

Budget Estimate (AI):

$300,000 – $400,000

Based on the estimated construction cost of $348,587.36, the budget for this project is likely to be around $300,000 to $400,000, considering the contractor's overhead, profit, and other expenses. The actual budget may vary depending on the bid price and the contractor's ability to complete the project within the specified duration. The factors that may influence the likely payment range include the complexity of the project, the contractor's experience and reputation, and the availability of materials and labor.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.