Big Johnson Channel Stabilization
Title:  

Big Johnson Channel Stabilization

Agency:  

City of Colorado Springs

State:  

Colorado

NAICS Code:  

237110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

B25-060CA

Open Date:  

7/16/2025

Pre-Bid Meeting Date:  

7/18/2025

Questions Due Date:  

7/25/2025

Close Date:  

8/7/2025

Last Updated:  

8/3/2025

Description:
The Big Johnson Channel Stabilization project involves constructing improvements to address erosion at a location south of the intersection of Powers Blvd and Peak Innovation Parkway. The project includes the stabilization of the drainage channel downstream of pond 705 with channel grading improvements, 4 sculpted concrete drop structures, and riprap installation within the channel. The project requires various technical specifications, including CDOT mobilization, clearing and grubbing, removal of structures and obstructions, excavation and embankment, aggregate base course, steel sheet piles, riprap, structural concrete, reinforcing steel, sculpted concrete, metal railings, Portland cement concrete pavement, warning signs, barrier fence and gate, topsoil, erosion control, seeding, and soil retention covering. • The project is located outside the City of Colorado Springs boundary, south of the Colorado Springs Airport. • The project requires electronic bid submission. • The project has a lump sum pricing. • The project requires insurance. • The project has a prebid conference, which is recommended but not mandatory.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Crystal A Abeyta

crystal.abeyta@coloradosprings.gov

(719) 385-5274

Budget Estimate (AI):

$500,000 – $2,000,000

Based on the project's scope, including the construction of 4 sculpted concrete drop structures, riprap installation, and other technical specifications, the estimated budget for this project could range from $500,000 to $2,000,000. This estimate is rough and based on the assumption that the project requires significant materials and labor for the construction of the channel stabilization and drainage improvement. Factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the location of the project.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.