Replace Chiller JBSA Fort Sam Houston
Agency:U.S. Department Of Defense
State:Texas
NAICS Code:238220
Industry:Construction
Solicitation Type:Sole Source
Solicitation ID:FA3016FY26FSHChillerReplacement
3/19/2026
Close Date:3/25/2026
Project Duration:30 days
Last Updated:Please visit the bid source via the “Link to Bid Source” button below for documentation.
Aaron Scott(Contract Specialist)
aaron.scott.24@us.af.mil
$200,000 – $500,000
The estimated budget for this project can be estimated based on the scope of work, which includes the replacement of a 150-ton chiller and associated chilled water pump, as well as all necessary electrical, piping, and control system modifications. The cost of a 150-ton chiller can range from $50,000 to $200,000, depending on the manufacturer and model. Additionally, the cost of labor, materials, and other expenses such as disposal of the old equipment and testing of the new system must be considered. Therefore, a reasonable estimate for the total budget could be between $200,000 and $500,000.
The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.
Success stories in virtually every industry you can check out by clicking here.