Y--Alcova-Boysen Thermopolis-Worland Tap OPGW
banana leaves
Back

This opportunity is closed, click here to see similar open opportunities.

Title:  

Y--Alcova-Boysen Thermopolis-Worland Tap OPGW

Agency:  

U.S. Department Of Energy

State:  

Colorado

NAICS Code:  

237130

Industry:  

Utilities and Waste Management

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

89503225BWA000068

Open Date:  

6/3/2025

Close Date:  

8/22/2025

Last Updated:  

Description:
The Western Area Power Administration (WAPA) is seeking a contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete the Alcova-Boysen Thermopolis-Worland Tap OPGW project. The project includes installation of 121-miles of optical overhead ground wire (OPGW) on existing 115-kV transmission lines, removing 121 miles of steel overhead ground wire, and other related tasks. • Installation of 121-miles of optical overhead ground wire (OPGW) on existing 115-kV transmission lines • Removal of 121 miles of steel overhead ground wire • Installation of steel angle bedrails and anti-split pole bands to existing wood pole suspension structures • Installation of underground fiber optic cable, splice boxes, and associated fiber equipment • Installation of spiral dampers • Performing fiber splicing and testing
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

John W. Pratt

jpratt@wapa.gov

(720) 962-7166

Budget Estimate (AI):

$15,000,000 – $25,000,000

The budget for this project can be estimated based on the scope of work, which includes installation of 121-miles of optical overhead ground wire (OPGW) and other related tasks. The cost of materials, labor, and equipment for such a project can be substantial. Assuming an average cost of $100,000 per mile for OPGW installation, the total cost for 121 miles would be $12,100,000. Adding costs for removal of steel overhead ground wire, installation of steel angle bedrails, and other tasks, the total budget could be in the range of $15 million to $25 million.

Similar Opportunities powered by Bid Banana AI™

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.

The Bid Lab Group