Fencing for Sherman Detention Pond

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Fencing for Sherman Detention Pond

Agency:  

Rhode Island Warwick Public Schools

State:  

Rhode Island

NAICS Code:  

238990

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

26-0001

Open Date:  

7/30/2025

Pre-Bid Meeting Date:  

8/6/2025(Mandatory)

Questions Due Date:  

8/8/2025

Close Date:  

8/14/2025

Last Updated:  

8/14/2025

Description:
The Warwick Public Schools is requesting proposals for the installation of fencing around the detention pond at Sherman Elementary School. The proposed fence should be approximately 175 feet long, 6 feet high, and made of black vinyl-coated material with a matching post, caps, and hardware. A 3-foot gate is also required, which should be lockable with a padlock. The area is not level, and all bidders are required to attend a pre-bid meeting. The project requires prevailing wages, certified payroll, and liability insurance. • The bid should include a price breakdown for all labor, installation, and materials. • The bid should include completed bid forms with all required signatures. • The bid should include required licenses and certifications to complete all work requested in this solicitation. • The bid should be submitted electronically through BidNet Direct.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

There is no contact information available at this time.

Budget Estimate (AI):

$9,250 – $14,750

The budget for this project can be estimated based on the materials and labor required for the installation of the fence. The total length of the fence is approximately 175 feet, and the height is 6 feet. The cost of materials, including the black vinyl-coated fence, posts, caps, and hardware, can range from $30 to $50 per linear foot, depending on the quality and brand of the materials. The total material cost can be estimated to be between $5,250 and $8,750. The labor cost will depend on the number of workers, their hourly wage, and the number of hours required to complete the project. Assuming a crew of two workers with an average hourly wage of $50, and a project duration of 2-3 days, the total labor cost can be estimated to be between $4,000 and $6,000. Therefore, the total budget for this project can be estimated to be between $9,250 and $14,750.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.