Woodlake Trail Improvements Project
Title:  

Woodlake Trail Improvements Project

Agency:  

Colorado El Paso County

State:  

Colorado

NAICS Code:  

237990

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

IFB-25-057

Open Date:  

5/21/2025

Questions Due Date:  

5/30/2025

Close Date:  

6/18/2025

Project Duration:  

180 days

Last Updated:  

6/16/2025

Description:
The Woodlake Trail Improvements Project involves improving existing trails damaged by rain and flooding in 2023. The project includes re-grading and re-surfacing approximately 3,455 linear feet of 8-foot wide trail, repairing culverts, and fixing erosion along the trail corridor at 12 locations. The contractor will be responsible for providing all necessary materials, labor, and equipment. The project is funded by FEMA and El Paso County, and the contractor must comply with all federal, state, and local laws and regulations. The contract term is from July 15, 2025, to December 31, 2025, with a possible extension to complete any remaining work. Key aspects of the project include: • Unclassified excavation and fill material placement • Crushed limestone surfacing • Riprap installation • Geotextile fabric placement • Erosion control and stormwater management • Seeding and re-vegetation The contractor must have at least 5 years of experience in similar projects and provide details of three completed projects. The contractor will be paid based on a lump sum price, and payments will be made monthly based on the work completed and accepted by the county.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Matthew Marter(Procurement Specialist)

matthewmarter@elpasoco.com

(719) 520-6663

Budget Estimate (AI):

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves approximately 3,455 linear feet of trail improvement, which includes excavation, fill material placement, crushed limestone surfacing, riprap installation, and erosion control measures. The cost of these materials and labor can vary depending on the location, supplier, and other factors. However, based on industry standards and average costs, a rough estimate for the project can be made. Assuming an average cost of $50 per linear foot for trail construction, the total cost for the project would be approximately $172,750. Additionally, the cost of materials such as crushed limestone, riprap, and geotextile fabric will add to the overall cost. Considering these factors, a reasonable estimate for the budget for this project could be between $200,000 and $500,000.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.