3CA07375 Barracks Shower Replacement Services

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

3CA07375 Barracks Shower Replacement Services

Agency:  

California Department of Forestry and Fire Protection (CAL FIRE)

State:  

California

NAICS Code:  

238220

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

3CA07375

Open Date:  

7/28/2025

Pre-Bid Meeting Date:  

8/5/2025(Mandatory)

Questions Due Date:  

8/12/2025

Close Date:  

8/26/2025

Project Duration:  

365 days

Last Updated:  

8/26/2025

Description:
The California Department of Forestry and Fire Protection (CAL FIRE) is seeking a contractor to provide Barracks Shower Replacement Services at their San Diego Unit (SDU) location. The contractor will be responsible for replacing seven existing fiberglass shower units with new stainless steel shower pans and wall panels, including associated plumbing fixture upgrades and finish work. The project requires the contractor to provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees. A mandatory site walk-through is scheduled on August 05, 2025, and the contractor must submit their bid by August 19, 2025. • The project involves replacing existing fiberglass shower units with new stainless steel shower pans and wall panels. • The contractor must provide all materials, labor, equipment, tools, permits, taxes, transportation, and fees. • A mandatory site walk-through is scheduled on August 05, 2025. • The contractor must submit their bid by August 19, 2025. • The project requires compliance with various regulations, including prevailing wage rates and labor code provisions. • The contractor must have a valid B - General Contractor license issued by the California State Licensing Board (CSLB). • The contractor must be certified as a California Small Business or Disabled Veteran Business Enterprise.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Gloria Pietromonaco(Contract Analyst)

gloria.pietromonaco@fire.ca.gov

(916) 894-9853

Budget Estimate (AI):

$200,000 – $500,000

Based on the scope of work, which involves replacing seven existing fiberglass shower units with new stainless steel shower pans and wall panels, including associated plumbing fixture upgrades and finish work, the estimated budget for this project could range from $200,000 to $500,000. This estimate is based on the assumption that the cost of materials, labor, and equipment for the project will be substantial, given the need to replace existing shower units and upgrade plumbing fixtures. Additionally, the project requires compliance with various regulations, including prevailing wage rates and labor code provisions, which may impact the overall cost of the project. The actual budget may vary depending on the contractor's bid and the state's approval of the bid.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.