This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

James Island Restoration Phase I

Agency:  

U.S. Department Of Defense

State:  

Maryland

NAICS Code:  

237990

Industry:  

Civil Engineering

Solicitation Type:  

Sole Source

Solicitation ID:  

W912DR25H13SY

Open Date:  

4/8/2025

Close Date:  

4/22/2025

Project Duration:  

1095 days

Last Updated:  

4/15/2025

Description:
The U.S. Army Corps of Engineers (USACE), Baltimore District is seeking letters of interest from qualified contractors for the potential construction of the James Island Phase 1 Restoration project. The project involves the construction of dikes and the dredging and stockpiling of sand materials. The contractor will be required to provide all necessary labor, equipment, materials, and transportation to perform the construction. The project is expected to last approximately 1095 calendar days. Key features of the project include: • Construction of dikes (approximately 10,000 linear feet) • Dredging and stockpiling of sand materials (approximately 3,000,000 cubic yards) • Installation of stone, geotextile, and sand materials to create a perimeter dike structure • Excavation of substantial sand materials from a local borrow area The USACE is seeking responses from qualified contractors, including small and large businesses, to determine the extent of capable firms that can perform the work. Responders must address specific criteria, including prior experience with similar projects, bonding capability, and suggestions for a reasonable period of performance.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Aisha Boykin

aisha.r.boykin@usace.army.mil

(410) 962-4978

Budget Estimate (AI):

$100,000,000 – $250,000,000

The budget for this project is estimated to be between $100,000,000 and $250,000,000, based on the magnitude of construction stated in the notice. This estimate is influenced by the scope of the project, which includes the construction of dikes and the dredging and stockpiling of sand materials. The complexity of the project, the location, and the required materials and equipment also contribute to the estimated budget range.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.