Replace HVAC at USCG STA Channel Islands Harbor

This opportunity is closed, click here to see similar open opportunities.

Title:  

Replace HVAC at USCG STA Channel Islands Harbor

Agency:  

U.S. Department Of Homeland Security

State:  

California

NAICS Code:  

238220

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

30796PR250000009

Open Date:  

9/13/2025

Close Date:  

9/19/2025

Last Updated:  

Description:
The United States Coast Guard is seeking a contractor to replace the failed HVAC systems and install new air conditioning units in three buildings at the USCG STA Channel Islands Harbor in Oxnard, CA. The contractor will provide all labor, materials, and equipment necessary to complete the installation in compliance with industry standards and applicable regulations. The scope of work includes mobilization, adding air conditioning to existing forced air furnace systems, replacing roof top units, installing split unit systems, and demobilization. The contractor must ensure that all areas are cleaned up and returned to their original condition upon completion of the project. • Replace HVAC systems in the Main Station Building, Maintenance Shop, and South Building • Install new air conditioning units and furnaces • Ensure compliance with industry standards and applicable regulations • Clean up and return all areas to their original condition upon completion • Minimize impact to Coast Guard operations • Work performed between 7:00AM and 5:00PM, Monday through Friday, excluding Federal Holidays
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Shawn Jenkins

shawn.t.jenkins@uscg.mil

Budget Estimate (AI):

$175,000 – $300,000

The budget for this project can be estimated based on the scope of work and the materials required. The installation of new HVAC systems, air conditioning units, and furnaces in three buildings may require a significant amount of labor, materials, and equipment. Assuming an average cost of $100 per square foot for HVAC installation, the total cost for the 8,672 square foot Main Station Building, 2,358 square foot Maintenance Shop, and 1,336 square foot South Building would be around $125,000 to $200,000. Additionally, the cost of materials, labor, and equipment may add up to $50,000 to $100,000. Therefore, the total budget for this project can be estimated to be around $175,000 to $300,000.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.