Johnson Valley Pump Station Electrical Design Services
Title:  

Johnson Valley Pump Station Electrical Design Services

Agency:  

California Mojave Water Agency

State:  

California

NAICS Code:  

541330

Solicitation Type:  

Request for Proposal

Solicitation ID:  

MWA-0000000081

Open Date:  

5/19/2025

Pre-Bid Meeting Date:  

7/10/2025(Mandatory)

Site Visit Date:  

7/10/2025

Questions Due Date:  

7/24/2025

Close Date:  

8/7/2025

Project Duration:  

6 months

Last Updated:  

6/15/2025

Description:
The Mojave Water Agency is seeking professional design services to overhaul the electrical systems at the Johnson Valley Pump Station. The selected consultant will evaluate the existing system, determine the level of effort and required upgrades to bring the system up to current standards, and provide planning, design, bid support, and engineering support during construction. The project includes tasks such as a motor control center upgrade, variable frequency drive upgrade, and provision of construction plans and technical specifications. The consultant should consider the existing infrastructure, pipeline alignments, future demands, and any equipment on site. Key information about the job includes: • The project is located in San Bernardino County, California • The Johnson Valley Pump Station is a vital component of the water delivery system on the Morongo Basin Pipeline • The existing equipment was installed in the early 1990s and is in need of upgrade or replacement • The project objective is to get a proper functioning and up-to-date electrical system that incorporates current industry standards • The selected firm will be expected to perform tasks such as project management, data gathering, design and bid support, and engineering support during construction
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Theresa Murena

tmurena@mojavewater.org

(760) 946-7000

Budget Estimate (AI):

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the requirements of the project. Considering the tasks involved, such as project management, data gathering, design and bid support, and engineering support during construction, the budget could be in the range of $200,000 to $500,000. This estimate is based on the assumption that the project will require significant design and engineering efforts, as well as construction support. The actual budget may vary depending on the complexity of the project, the experience and qualifications of the selected firm, and the specific requirements of the Mojave Water Agency.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.