Project DescriptionThis project generally consists of the demolition, repair and/or replacement of the roof systems of the Coordinated Science Lab (0148) and the Materials Science & Engineering Building (0034) at the University of Illinois Urbana- Champaign (UIUC).Base Bid CSL: Includes the preparation and coating of all existing metal roofs, replacement of the existing skylight system, new ladder and walkway access at towers and around skylight, replacement of all existing gutter liners and flashings, and replacement of all low slope roofing systems with new membrane roofing assemblies. Alternates include full slate roof replacement at MSEB (Alt. #1), replacement of all flat roofing systems at MSEB (Alt. #2), and replacement of all standing seam metal roofing at CSL (Alt. #3). This Project is located at: MSEB: 1304 W Green St, Urbana, IL 61801 CSL: 1308 W Main St, Urbana, IL 61801 A MANDATORY virtual pre-bid conference for all parties interested in bidding the project will be held at 10:00 AM on 7/15/2025 through 312-626-6799, Meeting ID: 895 2112 5308, Password: 1867. Another MANDATORY virtual pre-bid conference for all parties interested in bidding the project will be held at 10:00 AM on 7/22/2025 through 312-626-6799, Meeting ID: 886 8749 4926, Password: 1867. Representatives of the Owner and the Professional Services Consultant will be present to answer questions regarding the project and bidding procedures. All prospective bidders are REQUIRED to attend at least one mandatory pre-bid conference. See attached for complete details.