Needed Service: Gas Line Replacement Ordering Location and Address: Buckeye Lake State Park 2871 Liebs Island Rd. Millersport, OH 43046Project Background This gas line supplies gas for heat at the Buckeye Lake State Park maintenance shop. Specifications/Scope of WorkReplace roughly 450ft of 2-inch pipe from the meter to the maintenance building.Bore the line in and connect to the meter set and house line at the building.Post installation, test line per code to ensure no leaks.Back fill holes to a rough grade to allow settling.Vendor to provide all materials, labor and permits needed for the service.Vendor responsible for demo, haul away, site clean-up.The work can begin as soon as possible. Work to be done Monday – Friday.Completion/Delivery Date: As soon as possibleSite Visit & Point of ContactPrior to submitting a bid response, offerors are encouraged to visit the site location. Contact Mark Hoffhines (740)572-1157Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.