Temporary Wall Replacement at Denison Powerhouse, Denison, TX

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Temporary Wall Replacement at Denison Powerhouse, Denison, TX

Agency:  

U.S. Department Of Defense

State:  

Oklahoma

NAICS Code:  

236220

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

W912BV24R0103

Open Date:  

4/9/2025

Close Date:  

4/30/2025

Project Duration:  

730 days

Last Updated:  

4/16/2025

Description:
The project involves the demolition and disposal of the existing temporary wall and support structure, as well as the design and construction of a new permanent wall and support structure at the Denison Powerhouse in Denison, TX. The contractor will be required to commence work within 10 days after Notice to Proceed and complete the work within 730 days. The contract will be awarded under the best value continuum using the Lowest Price Technically Acceptable process. • The project includes the demolition and disposal of the existing temporary wall and support structure. • The project includes the demolition and disposal of the existing wood plank flooring and support structure at the Generator Room Level. • The project includes the design and construction of a floor grating system on the Generator Room Level. • The project includes the design and construction of a new structurally independent permanent wall and support structure on the north side of the powerhouse. • The contractor will be required to commence work within 10 days after Notice to Proceed. • The contractor will be required to complete the work within 730 days after receipt of Notice to Proceed.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Cheyenne Redemann

cheyenne.a.redemann@usace.army.mil

(918) 669-7073

Budget Estimate (AI):

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes the demolition and disposal of the existing temporary wall and support structure, as well as the design and construction of a new permanent wall and support structure. The estimated budget can range from $500,000 to $2,000,000, considering the complexity of the project and the materials required. Factors that may influence the likely payment range include the cost of materials, labor costs, and the contractor's overhead and profit margin.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.