R3 Geotechnical Drilling, Sampling and instrumentation US101 MP304.6 Retz Creek Landslide
Title:  

R3 Geotechnical Drilling, Sampling and instrumentation US101 MP304.6 Retz Creek Landslide

Agency:  

Oregon Department of Transportation

State:  

Oregon

NAICS Code:  

541330

Industry:  

Civil Engineering

Solicitation ID:  

S-73000-00014127

Open Date:  

6/13/2025

Close Date:  

7/1/2025

Project Duration:  

120 days

Last Updated:  

6/29/2025

Description:
The Oregon Department of Transportation is seeking a qualified contractor to provide drilling, geotechnical sampling, and instrumentation for the Retz Creek Landslide project. The work includes subsurface drilling, geotechnical sampling, and instrumentation. The contractor will be required to complete all work by November 1, 2025. The contractor must have a minimum of 3 years experience with geotechnical sampling and furnish a drill crew consisting of at least one drill operator with a minimum of three years operator experience. • The project location is US101 MP304.6 Retz Creek Landslide (K23696) • The contractor will be paid based on actual, measured quantities • The contractor must provide all necessary equipment, machinery, tools, lighting, supplies, materials, fuel, mobilization, water, water delivery, setup, safety equipment, skilled personnel, and incidentals to perform the specified work • Traffic control, if necessary, will be coordinated by the Oregon Department of Transportation (ODOT) within the limitations of the ‘Traffic Control’ section of this text.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Terri Sinclair-Olson(Purchaser)

terri.sinclair-olson@odot.oregon.gov

Budget Estimate (AI):

$500,000 – $1,500,000

Based on the scope of work, which includes drilling, sampling, and instrumentation, and considering the project duration of approximately 120 days, the budget can be estimated to be in the range of $500,000 to $1,500,000. This estimate takes into account the costs of equipment, labor, and materials required for the project. However, the actual budget may vary depending on the complexity of the work, the number of personnel required, and other factors.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.