048-25 Roof Replacement - Rome Downtown Racquets Center
Title:  

048-25 Roof Replacement - Rome Downtown Racquets Center

Agency:  

Georgia City of Rome

State:  

Georgia

NAICS Code:  

238160

Industry:  

Construction

Solicitation Type:  

Request for Quotation

Solicitation ID:  

048-25

Open Date:  

8/25/2025

Pre-Bid Meeting Date:  

9/4/2025

Site Visit Date:  

9/4/2025

Questions Due Date:  

9/8/2025

Close Date:  

9/16/2025

Project Duration:  

114 days

Last Updated:  

9/10/2025

Description:
The City of Rome is seeking a contractor to replace the roof of the Rome Downtown Racquets Center. The project includes removing the existing metal and materials, installing a new layer of high temp ice and water shield, and installing a 16” wide 26 gauge standing seam panel. The contractor must also install new pipe flashings, drip edge, rake trim, ridge trim, and closure strip to complete a watertight roofing system. The project must be completed by December 15, 2025. • Remove existing metal and materials from the entire roof • Install a full layer of high temp ice and water shield on entire roof deck • Install a 16” wide 26 gauge standing seam panel on the entire roof • Install all new pipe flashings • Install new drip edge, rake trim, ridge trim, and closure strip to complete a watertight roofing system • Clean up and haul off all debris • Protect building interiors during construction • Provide a manufacturer’s 20-year NDL warranty on all material and labor • Protect the entire site from damage including lawn and landscaping • Clean up and haul off debris upon completion • Run a magnet over the entire site to ensure the removal of all nails/screws • Owner must approve all color and product selections
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Jackson Abercrombie(Purchasing Agent)

jabercrombie@romega.us

(706) 236-4413

Budget Estimate (AI):

$200,000 – $500,000

Based on the scope of work, which includes removing the existing metal and materials, installing a new layer of high temp ice and water shield, and installing a 16” wide 26 gauge standing seam panel, the estimated budget for this project could be in the range of $200,000 to $500,000. This estimate is rough and may vary depending on the actual cost of materials and labor.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.