BRIDGE REPLACEMENT COUNTY ROAD 401
Title:  

BRIDGE REPLACEMENT COUNTY ROAD 401

Agency:  

Cape Girardeau County

State:  

Missouri

NAICS Code:  

237310

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

BID #25-04HWY07082025

Open Date:  

6/17/2025

Close Date:  

7/8/2025

Project Duration:  

180 days

Last Updated:  

6/30/2025

Description:
The project consists of furnishing all labor, tools, equipment, and materials for the construction of a new bridge/low water crossing structure, including removal of the existing structure and improvements, excavation and embankment construction, dewatering, new concrete end bent construction, placing precast/prestressed reinforced concrete deck members, furnishing and placing rip rap stone, approach road construction and surfacing, restoration of adjacent grades, seeding and mulching, and any other associated items to complete the project in accordance with the plans and specifications prepared by Koehler Engineering and Land Surveying, Inc. The key features of the project include: • Removal of existing improvements/grubbing • On-site excavation • 8" thick type (5) aggregate base • 8" thick concrete pavement • Furnishing type 2 rock blanket, 24" thick • Construction signing • Type III barricades • General contract requirements, including mobilization and demobilization • Separation geotextile • Furnish and install fertilizing, seeding, and mulching • Furnish and install silt fencing • Class 1 excavation in rock • Class B-1 concrete (substructure) • Reinforced concrete approach slabs with turndowns • Precast, prestressed concrete box beams, 48" wide x 11" deep x 25' long The project will be awarded to the lowest, responsive, responsible bidder. The contractor shall perform a minimum of 30% of the project work directly with their own forces.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Chris Koehler(Engineer)

kkoehler@koehlerengineering.com

(573) 335-3026

Budget Estimate (AI):

$1,000,000 – $5,000,000

Based on the project description, the estimated budget for this project could be in the range of $1 million to $5 million. This estimate is based on the scope of work, which includes the construction of a new bridge/low water crossing structure, removal of the existing structure, and associated items. The actual budget will depend on the bids received and the final contract award.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.