RFI: Network Cabling Installation

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

RFI: Network Cabling Installation

Agency:  

U.S. Department Of The Treasury

State:  

West Virginia

NAICS Code:  

238210

Industry:  

Information Technology and Software Development

Solicitation Type:  

Request for Information

Solicitation ID:  

20342225N00002

Open Date:  

4/10/2025

Close Date:  

4/17/2025

Project Duration:  

Approximately 45 days, as the anticipated Period of Performance will start as soon as possible and needs to be completed no later than 05/31/2025.

Last Updated:  

4/16/2025

Description:
The United States Office of Government Ethics (OGE) is seeking capable vendors to support the removal and reinstallation of new network cabling. The project involves providing all necessary services, qualified personnel, materials, and equipment to perform the Statement of Work (SOW). The scope of work includes site survey, data cable removal, patch panels, data cabling, and cable support system. The contractor will be responsible for providing labor, materials, and equipment required to remove previous data cabling and install a structured cabling system. Key aspects of the project include: • The contractor must provide all materials, supplies, and labor to complete the work outlined in the SOW. • The contractor must ensure that all wiring meets national fire protection standards and codes. • The contractor will be responsible for the cleanup and disposal of refuse generated during the performance of their duties. • The contractor must provide documentation showing the location of cable termination points and record all installed equipment, cabling, and testing of said equipment in final closeout documentation.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Kaity Eaton

purchasing@fiscal.treasury.gov, kaity.eaton@fiscal.treasury.gov

Budget Estimate (AI):

$100,000 – $300,000

The budget for this project can be estimated based on the scope of work, which includes the removal and reinstallation of network cabling for 66 data drops. The cost of materials, labor, and equipment will depend on various factors such as the location, complexity of the project, and the contractor's rates. A rough estimate for the project could be between $100,000 and $300,000, considering the cost of materials, labor, and equipment for a project of this scope. Factors that may influence the likely payment range include the contractor's experience, the complexity of the project, and the location of the project.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.