Eastside Elevated Water Reservoir

This opportunity is closed, click here to see similar open opportunities.

Title:  

Eastside Elevated Water Reservoir

Agency:  

City of Ridgefield

State:  

Washington

NAICS Code:  

22131

Industry:  

Civil Engineering

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

P23016-2

Open Date:  

11/6/2025

Pre-Bid Meeting Date:  

11/18/2025(Mandatory)

Questions Due Date:  

12/5/2025

Close Date:  

12/16/2025

Project Duration:  

502 days

Last Updated:  

Description:
The City of Ridgefield is seeking bids from highly qualified contractors to provide all labor, supplies, equipment, and materials for the construction of a 2.5-million-gallon composite elevated water reservoir, foundation and soil improvements; site grading and surfacing; installation of water, electrical power, telecommunications, irrigation, and stormwater utilities; landscaping and installation of security fencing, gates and surveillance equipment, site improvements and other work. All work shall be completed in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. • The project includes the construction of a 2.5-million-gallon composite elevated water reservoir • The project includes foundation and soil improvements • The project includes site grading and surfacing • The project includes installation of water, electrical power, telecommunications, irrigation, and stormwater utilities • The project includes landscaping and installation of security fencing, gates and surveillance equipment • The project includes site improvements and other work • All work shall be completed in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Jason Van Dyke(Procurement Coordinator)

jason.vandyke@ridgefieldwa.us

(360) 887-6008

Budget Estimate (AI):

$10,000,000 – $20,000,000

The budget for this project is estimated to be around $10 million to $20 million, based on the scope of work and the cost of materials and labor. The city has allocated funds for the project through the Washington State Drinking Water State Revolving Fund (DWSRF) Program with federal funds from the U.S. Environmental Protection Agency. The actual budget will depend on the bids received and the final contract award.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.