Garvey Reservoir Rehabilitation Stage 1
Title:  

Garvey Reservoir Rehabilitation Stage 1

Agency:  

The Metropolitan Water District of Southern California

State:  

California

NAICS Code:  

237110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

2110

Open Date:  

7/31/2025

Pre-Bid Meeting Date:  

8/12/2025(Mandatory)

Questions Due Date:  

8/27/2025

Close Date:  

9/9/2025

Project Duration:  

620 working days

Last Updated:  

8/26/2025

Description:
The Garvey Reservoir Rehabilitation Stage 1 project involves removing, disposing, and replacing the existing membrane liner and floating cover system, reinforcing the outlet tower, demolishing a portion of the existing 51-inch diameter pipe and corresponding outlet structure, constructing a new 51-inch diameter pipe and outlet structure, installing new electrical duct banks and various electrical upgrades, replacing mechanical equipment and instrumentation and controls, cast-in-drilled-hole (CIDH) piles, asphalt paving, site restoration, fabricating and installing slide gates, abatement of materials containing asbestos and lead, and other appurtenant work as specified and shown on the drawings. The project is estimated to cost between $80,000,000 and $130,000,000 and will last for 620 working days. • The project requires a pre-bid meeting, which is mandatory for all bidders. • The project involves a variety of construction activities, including demolition, excavation, and installation of new equipment and systems. • The project requires compliance with various regulations, including those related to asbestos and lead abatement, and prevailing wage requirements. • The project involves a Project Labor Agreement (PLA), which requires the successful bidder and its subcontractors to comply with the terms of the agreement.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

SpecsDesk@mwdh2o.com

(213) 217-6515

Budget Estimate (AI):

$80,000,000 – $130,000,000

Based on the estimated cost of the project, which ranges from $80,000,000 to $130,000,000, the budget for the contractor can be expected to be within this range, depending on the final cost of the project and the terms of the contract. The budget may be influenced by factors such as the complexity of the project, the availability of materials and labor, and the contractor's ability to complete the project on time and within budget.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.