LTR Traction Power Substation Replacement
Title:  

LTR Traction Power Substation Replacement

Agency:  

Maryland Transit Administration

State:  

Maryland

NAICS Code:  

237130

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

BPM050419

Open Date:  

3/31/2025

Pre-Bid Meeting Date:  

5/6/2025

Questions Due Date:  

4/28/2025

Close Date:  

9/29/2025

Project Duration:  

3650 days

Last Updated:  

6/20/2025

Description:
The Maryland Transit Administration is seeking a contractor to replace 26 existing prefabricated traction power substations for the MTA Light RailLink light rail system serving greater Baltimore, MD. The replacement work includes removal of the existing prefabricated type substation enclosures, and design, fabrication, factory testing, delivery, installation, field testing acceptance testing and commissioning for new 2 MW prefabricated-type traction power substations. The work also includes the addition of 750 Vdc pad-mounted load-break disconnect switches and modifications to existing 750 Vdc duct bank and cable systems to interface the new substations and load-break switches with the existing 750 Vdc power distribution systems at all 28 prefabricated Substation locations. Key responsibilities include: designing and installing the new substations, providing all necessary materials and equipment, and ensuring compliance with relevant codes and regulations. • The contract is expected to last for approximately 10 years, with a total duration of 3650 calendar days. • The contractor will be required to provide a detailed project schedule and timeline. • The contractor will be responsible for ensuring that all work is completed in accordance with the contract specifications and requirements. • The contractor will be required to provide regular progress reports and updates to the Maryland Transit Administration. • The contractor will be responsible for ensuring that all necessary permits and approvals are obtained prior to commencing work.
Attached Files:

Amendment (Approved): LTR TPSS Replacement [T-1554-0140] Addendum No. 002_05/16/25

Amendment (Approved): Addendum No. 1

Specification Document (Approved): LTR Traction Power Substation Replacement

Contact Information:

Jodie Biden(Procurement Officer)

jbiden@mdot.state.md.us

(410) 767-5626

Budget Estimate (AI):

$50,000,000 – $100,000,000

Based on the scope of the project, which includes the replacement of 26 traction power substations, the estimated budget for this contract could range from $50 million to $100 million. This estimate takes into account the costs of materials, labor, and equipment, as well as the complexity of the project and the need for specialized expertise. The actual budget may vary depending on the contractor's bid and the final terms of the contract. Factors that may influence the likely payment range include the cost of materials, the number of workers required, and the duration of the project.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.