TINKER AFB MAC BOA WWYK210364 Construct Loading Dock & Dock Leveler, B3113

This opportunity is closed, click here to see similar open opportunities.

Title:  

TINKER AFB MAC BOA WWYK210364 Construct Loading Dock & Dock Leveler, B3113

Agency:  

U.S. Department Of Defense

State:  

Oklahoma

NAICS Code:  

236220

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

WWYK210364

Open Date:  

11/12/2025

Pre-Bid Meeting Date:  

9/16/2025(Mandatory)

Site Visit Date:  

9/16/2025(Mandatory)

Questions Due Date:  

10/1/2025

Close Date:  

11/25/2025

Project Duration:  

180 days

Last Updated:  

Description:
The US Air Force is seeking a contractor to construct a loading dock and dock leveler at Tinker Air Force Base in Oklahoma. The project involves building a concrete deck with a curb for containment and a supporting structure that can be steel or concrete. The dock leveler will be a scissor lift with vehicle restraint, and the platform size is approximately 12 feet long by 7 to 8 feet wide. The contractor will be responsible for storing and testing excavated material for contaminants, and disposal will be handled as a differing site condition if contamination is confirmed. The project requires a 35%, 65%, 95%, and 100% IFC design package, and the government is willing to start with the 65% design review. • The project location is Tinker AFB, B3113, Oklahoma 73145 • The project consists of construction of a loading dock and dock leveler • The supporting structure can be steel or concrete • The dock leveler will be a scissor lift with vehicle restraint • The contractor will be responsible for storing and testing excavated material for contaminants • Disposal will be handled as a differing site condition if contamination is confirmed
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Sara Hinds

sara.hinds.2@us.af.mil

Budget Estimate (AI):

$1,000,000 – $5,000,000

The budget for this project is estimated to be between $1,000,000 and $5,000,000, as mentioned in the document. This estimate is based on the scope of work, which includes the construction of a loading dock and dock leveler, and the requirement for a 35%, 65%, 95%, and 100% IFC design package. The actual budget may vary depending on the complexity of the project, the materials used, and the labor costs.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.