Buckley SFB - Replace Boiler Vent Piping
Title:  

Buckley SFB - Replace Boiler Vent Piping

Agency:  

U.S. Department Of Defense

State:  

Colorado

NAICS Code:  

238220

Industry:  

Construction

Solicitation Type:  

Request for Proposal

Solicitation ID:  

FA2543BoilerExhaustVentReplacement

Open Date:  

4/2/2026

Close Date:  

4/9/2026

Project Duration:  

60 days

Last Updated:  

Description:
The United States Space Force is seeking a contractor to replace the boiler vent piping at Buckley Space Force Base in Colorado. The contractor will be responsible for providing all necessary supplies, materials, tools, equipment, and qualified labor to replace the existing boiler venting. The project includes replacing the exhaust and air intake vent piping for four boilers in building 205. The contractor must ensure that all work is performed in accordance with the manufacturer's specifications and relevant codes and standards. The project has a completion timeframe of 60 calendar days after the date of award. The contractor will be required to provide a final report of work, including photographs, inspection times and dates, and results of all leak checks. • The project involves replacing the boiler vent piping for four boilers in building 205. • The contractor must ensure that all work is performed in accordance with the manufacturer's specifications and relevant codes and standards. • The project has a completion timeframe of 60 calendar days after the date of award. • The contractor will be required to provide a final report of work, including photographs, inspection times and dates, and results of all leak checks. • The contractor must remove and dispose of all removed parts and materials after the project is complete.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Cody Wolff

cody.wolff@spaceforce.mil

(720) 847-9945

Budget Estimate (AI):

$75,000 – $200,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves replacing the boiler vent piping for four boilers, which may require significant materials and labor. Assuming an average cost of $50,000 to $100,000 for the materials and labor required for the project, and considering the need for specialized tools and equipment, the total budget for this project could be in the range of $75,000 to $200,000. The final budget will depend on the contractor's bid and the actual costs incurred during the project.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.