Wingfoot Wildlife Area Boating Access: White Birch Storage Building Maintenance Improvements

This opportunity is closed, click here to see similar open opportunities.

Title:  

Wingfoot Wildlife Area Boating Access: White Birch Storage Building Maintenance Improvements

Agency:  

Ohio Department of Natural Resources

State:  

Ohio

NAICS Code:  

236220

Industry:  

Construction

Solicitation Type:  

Request for Quotation

Solicitation ID:  

SRC0000036783

Open Date:  

2/23/2026

Pre-Bid Meeting Date:  

2/9/2026(Mandatory)

Questions Due Date:  

3/4/2026

Close Date:  

3/6/2026

Project Duration:  

133 days

Last Updated:  

Description:
The Ohio Department of Natural Resources is seeking bids for maintenance improvements to the White Birch Storage Building at the Wingfoot Wildlife Area. The project includes repairs to the drop ceiling and insulation, replacement of the existing ceiling furnace, and electrical system inspection and re-activation. The work must be completed by licensed contractors, and subcontractors are allowed. The project has a total area of approximately 2,628 square feet and is expected to be completed by June 30, 2026. * The building has a drop ceiling with framework 9'0" from the concrete floor, and there are 16 light fixtures supported by the drop ceiling framework. * The existing furnace is an oil-fired warm air furnace with a listed 105,000 BTU rating, and the replacement furnace should be a 2-stage, high-efficiency furnace of 100,000 BTU. * The electrical system inspection and re-activation include checking the main service panel, inspecting for damaged wiring, testing circuit breakers, and verifying grounding. * The contractor must provide all necessary materials and labor, and the work must be done in accordance with the specifications and requirements outlined in the solicitation.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Curt Wagner

curt.wagner@ohio.gov

Budget Estimate (AI):

$75,000 – $150,000

The budget for this project can be estimated based on the scope of work and the materials required. The project includes repairs to the drop ceiling and insulation, replacement of the existing ceiling furnace, and electrical system inspection and re-activation. The estimated cost of materials and labor for these tasks can range from $50,000 to $200,000, depending on the complexity of the work and the number of workers required. Additionally, the cost of permits, inspections, and other expenses should be factored into the estimate. Therefore, a reasonable estimate for the budget for this project is between $75,000 and $150,000.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.