Plumbing Work at City of Hollywood Wastewater Treatment Plant-Stabilization and Dewatering Buildings
Agency:City of Hollywood
State:Florida
NAICS Code:238110
Industry:Construction
Solicitation Type:Invitation for Bid
Solicitation ID:IFB-269-25-JJ
1/8/2025
Pre-Bid Meeting Date:1/22/2025
Questions Due Date:1/29/2025
Close Date:2/12/2025
Project Duration:730 days
Last Updated:Please visit the bid source via the “Link to Bid Source” button below for documentation.
Ameer Khan(Utility Asset Manager)
akhan@hollywoodfl.org
(754) 295-7526
$200,000 – $500,000
Based on the scope of work, which includes increasing floor drainpipe size, removing and replacing drain heads, repairing connections, and performing system inspections and cleaning, the estimated budget for this project could be in the range of $200,000 to $500,000. This estimate is based on the assumption that the project will require a significant amount of labor, materials, and equipment, and that the contractor will need to have a team of experienced plumbers and technicians to complete the work. The actual budget could be higher or lower, depending on the complexity of the project, the number of workers required, and the cost of materials and equipment.