Cured-In-Place Pipe (CIPP) Stormwater Pipe Rehabilitation (Re-Bid)
Title:  

Cured-In-Place Pipe (CIPP) Stormwater Pipe Rehabilitation (Re-Bid)

Agency:  

Pinellas County

State:  

Florida

NAICS Code:  

237110

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

25-0742-ITB-C

Open Date:  

6/11/2025

Questions Due Date:  

6/13/2025

Close Date:  

6/26/2025

Last Updated:  

6/20/2025

Description:
Pinellas County Public Works is seeking a qualified contractor to provide Cured-In-Place-Pipelining (CIPP) construction services for the rehabilitation of its stormwater infrastructure and sanitary sewer infrastructure. The contractor must have a minimum of five years of active experience in the commercial installation of stormwater management systems and have successfully installed at least 2,000,000 linear feet of stormwater pipeline within the State of Florida. The scope of work includes the lining of approximately six miles of corrugated metal pipes and numerous other reinforced concrete pipes in the stormwater system, as well as vitrified clay pipe and ductile iron pipe in the sanitary sewer system. • The contractor must meet all insurance, financial, and bonding requirements set by the Owner. • The contractor must have a minimum of five years of active experience in the commercial installation of stormwater management systems. • The contractor must have successfully installed at least 2,000,000 linear feet of stormwater pipeline within the State of Florida. • The contractor must provide a bonding letter from surety indicating the maximum amount the company can bond for. • The contractor must provide reference letters from companies that they have performed projects of a similar size and scope for.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

John Stolar(Procurement Analyst)

jstolar@pinellas.gov

(727) 464-4228

Budget Estimate (AI):

$5,000,000 – $20,000,000

The budget for this opportunity is not explicitly stated in the document. However, based on the scope of work, which includes the lining of approximately six miles of corrugated metal pipes and numerous other reinforced concrete pipes in the stormwater system, as well as vitrified clay pipe and ductile iron pipe in the sanitary sewer system, the budget could be substantial. A rough estimate for the budget could be in the range of $5 million to $20 million, considering the complexity and scale of the project. This estimate is based on industry standards for similar construction projects and the fact that the contractor must have a minimum of five years of active experience in the commercial installation of stormwater management systems.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.