Solar Powered E-Bike Charging Station

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Solar Powered E-Bike Charging Station

Agency:  

City of Sierra Vista

State:  

Arizona

NAICS Code:  

221114

Industry:  

Energy and Utilities

Solicitation Type:  

Request for Proposal

Solicitation ID:  

2025-RFP-039

Open Date:  

6/13/2025

Questions Due Date:  

6/20/2025

Close Date:  

7/9/2025

Last Updated:  

7/9/2025

Description:
The City of Sierra Vista is seeking a qualified firm to design, build, and install a solar-powered e-bike charging station outside the Sierra Vista Public Library. The charging station should have the capability to charge and provide lockable storage for up to 12 e-bikes or e-scooters and six e-skateboards at a time. The maximum size of the charging station should be 250 square feet, with a maximum height of 15 feet. The charging station should provide ambient light at night, have structural components made of aluminum or non-rusting materials, and provide surge-protected electricity for electronic devices. • The charging station should have a charge type of 120 volts and a battery capacity to charge an e-bike, e-scooter, or e-skateboard within 1 hour. • The charging station should have lockers configured to fit e-bikes, e-scooters, or e-skateboards. • The charging station should have the ability to monitor system information through solar charge controllers or mobile apps. • The charging station should accommodate City branding and color. • The charging station should have easy-to-clean surfaces and a minimum 115 wind rating.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Emily Duchon(Interim Chief Procurement Officer)

emily.duchon@sierravistaaz.gov

(520) 508-6016

Budget Estimate (AI):

$50,000 – $200,000

Based on the description of the project, the budget for this opportunity could be in the range of $50,000 to $200,000. This estimation is based on the cost of designing and installing a solar-powered e-bike charging station, including the cost of materials, labor, and potential additional features such as lockers and ambient lighting. The actual budget may vary depending on the complexity of the project, the experience of the firm, and the level of competition.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.