Amendment 0001 - Union Slough Emergency Levee Rehab Equipment

This opportunity is closed, see "Similar Opportunities" below to view similar open opportunities.

Title:  

Amendment 0001 - Union Slough Emergency Levee Rehab Equipment

Agency:  

U.S. Department Of Defense

State:  

Washington

NAICS Code:  

238910

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

W912DW25Q8011

Open Date:  

7/22/2025

Close Date:  

7/28/2025

Project Duration:  

47 days

Last Updated:  

7/28/2025

Description:
The project consists of installation of silt fencing, repairing and/or replacing armor rock along the slopes of the levee, placement of base course and topsoil, and hydroseeding all disturbed areas. The contractor will be required to furnish all necessary supplies, materials, earthmoving, and support equipment, complete with operator. Key equipment includes track-mounted hydraulic excavators, wheel loaders, and hydroseeding equipment. The project will be located near Everett, WA, and the contractor will be required to work in coordination with the on-site government representative. • The project has a total small business set-aside. • The period of performance is from 14 August to 30 September 2025. • The contractor will be required to pre-screen candidates using the E-verify Program. • Payment will be made at the purchase order lump sum price for mobilization and demobilization, and based on actual hours worked for equipment rental. • The contractor will be required to ensure that all personnel have PPE in accordance with EM 385-1-1.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Charles Idle

charles.d.idle@usace.army.mil

(206) 316-3998

Budget Estimate (AI):

$50,000 – $200,000

The budget for this project can be estimated based on the equipment and labor required. The project involves the installation of silt fencing, repair of armor rock, and hydroseeding, which will require significant equipment and labor costs. Assuming an average cost of $100 per hour for equipment rental and $50 per hour for labor, and estimating 100 hours of equipment rental and 200 hours of labor, the total cost would be around $15,000. However, this is a rough estimate and the actual budget could be higher or lower, depending on the specifics of the project. Additionally, the project has a total small business set-aside, which may affect the budget. A more realistic estimate would be between $50,000 and $200,000.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.