Industry Day - Cape Cod Space Force Station Power Generation Microgrid, US Army Corps of Engineers, New England District
Title:  

Industry Day - Cape Cod Space Force Station Power Generation Microgrid, US Army Corps of Engineers, New England District

Agency:  

U.S. Department Of Defense

State:  

Massachusetts

NAICS Code:  

221118

Industry:  

Energy and Utilities

Solicitation Type:  

Request for Proposal

Open Date:  

4/4/2025

Pre-Bid Meeting Date:  

5/13/2025

Site Visit Date:  

5/13/2025

Close Date:  

5/13/2025

Last Updated:  

4/10/2025

Description:
The U.S. Army Corps of Engineers (USACE), New England District is hosting an Industry Day for the Cape Cod Space Force Station (CCSFS) Power Generation Microgrid project. The project aims to construct a microgrid to replace the power generation plant and associated infrastructure with new electrical systems and backup power assets. The scope of work includes enabling an existing wind turbine to provide power to the facility, generators with black start capability, enhanced microgrid controls, and all infrastructure necessary for compliance with Uptime Institute's Tier IV requirements. The estimated construction cost is between $100,000,000 - $250,000,000. Key points to consider: • The project is a military construction project included in the Energy Resiliency and Conservation Investment Program (ERCIP). • The construction solicitation is targeted for issuing this Winter. • The project requires compliance with Uptime Institute's Tier IV requirements. • The project includes installation of electromagnetic shielding systems. • The project is located at the Cape Cod Space Force Station in Bourne, MA.
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Tyler Maryak

tyler.s.maryak@usace.army.mil

Budget Estimate (AI):

$100,000,000 – $250,000,000

The budget for this project can be estimated based on the estimated construction cost, which is between $100,000,000 - $250,000,000. Considering the scope of work, which includes the construction of a microgrid, generators, and infrastructure, the budget is likely to be in the higher end of the estimated range. Factors that may influence the likely payment range include the complexity of the project, the location, and the requirements for compliance with Uptime Institute's Tier IV requirements.

Similar Opportunities provided by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.