Drilling Horizontal Access Borehole

This opportunity is closed, click here to see similar open opportunities.

Title:  

Drilling Horizontal Access Borehole

Agency:  

Texas Edwards Aquifer Authority- K0151

State:  

Texas

NAICS Code:  

91242

Industry:  

Construction

Solicitation Type:  

Invitation for Bid

Solicitation ID:  

001-25-AMS

Open Date:  

5/5/2025

Questions Due Date:  

5/20/2025

Close Date:  

5/28/2025

Projected Award Date:  

7/8/2025

Project Duration:  

90 days

Last Updated:  

Description:
The Edwards Aquifer Authority (EAA) is seeking a qualified contractor to drill a horizontal access borehole at the EAA's Field Research Park site. The borehole will provide long-term access for subsurface water content monitoring using a neutron probe as part of a broader infiltration study. The project requires the contractor to drill a horizontal borehole between 200 and 400 feet in length, with a minimum depth of six feet below ground surface, and to install casing along the full length of the borehole. The contractor must also coordinate closely with EAA technical staff and provide access to drill cuttings throughout the drilling operation. Some key aspects of the project include: • Drilling a horizontal borehole at the designated research site • Constructing the borehole to allow passage of the downhole probe component of a 503 ELITE Hydroprobe system • Maintaining a minimum depth of six feet below ground surface along the full trajectory of the borehole • Using dry drilling methods to avoid introducing fluids into the subsurface • Coordinating closely with EAA technical staff and providing access to drill cuttings throughout the drilling operation
Attached Files:

Please visit the bid source via the “Link to Bid Source” button below for documentation.

Contact Information:

Maggie Veliz(Controller/Sr. Director of Finance)

contracting@edwardsaquifer.org

(210) 222-2204

Budget Estimate (AI):

$50,000 – $150,000

Based on the project description, the budget for this project is estimated to be around $100,000. This estimate is based on the fact that the project involves drilling a horizontal borehole, which is a specialized and potentially costly process. The EAA has also specified that the contractor must provide a firm, fixed price for the project, which suggests that the agency has a clear idea of the project's budget. Factors that may influence the likely payment range include the length and depth of the borehole, the type of casing material used, and the complexity of the drilling operation.

Similar Opportunities powered by Bid Banana AI

The Bid Lab’s Experts Are Ready To Help You Win RFPs

The Bid Lab is the only RFP consulting firm of its kind, specializing in guiding small and medium-sized businesses through the proposal response process. We have RFP experts ready to help you respond to that perfect opportunity you discover in Bid Banana.

  • Trusted by 100s of small business owners
  • Experience working on 1000s of RFP responses
  • Success stories in virtually every industry you can check out by clicking here.